A section of the sewer pipe running under the concrete floor of the property, from the toilet to the main sewer line, had two displaced joins. This allowed roots to grow into the pipe resulting in a blockage. The tenants of the property were experiencing problems with the toilet backing up.

Check out the full case study below to see how Blueline helped.

View PDF Case Study – First Ave