Category: Blueline Case studies

A stormwater pipe running under a property had a badly displaced join and a significant break causing the ground above to collapse into the pipe and threatening the integrity of a pool. Click on the link below to read this case study in full. Case Study – Anglers Esplanade

Read more

A section of the sewer pipe running under the concrete floor of the property, from the toilet to the main sewer line, had two displaced joins. This allowed roots to grow into the pipe resulting in a blockage. The tenants of the property were experiencing problems with the toilet backing up. Check out the full […]

Read more

Seniors Community Living “The Point”, consists of 91 luxury style units built across 5 separate buildings. During periods of heavy rain the basement car park would flood. To read the full case study – click on the link below. Case Study – The Point

Read more